How to Get Yurt Approval: 10 Strategies That Actually Work

Getting yurt approval in Australia doesn't have to be a nightmare. While council regulations vary across the country, successful yurt owners have developed proven strategies that consistently work. Council rules for yurts and domes vary widely across Australia. Many councils classify them as temporary structures not requiring approval, but this isn't guaranteed.

Whether you're planning a backyard studio, glamping business, or alternative living solution, these 10 strategies will significantly improve your chances of approval success.

Strategy 1: Master the 20m² Exempt Development Rule

The most powerful tool in your approval arsenal is understanding exempt development thresholds. Most Australian councils allow structures under 20m² without requiring development applications, provided they meet specific criteria.

Action Steps:

  • Choose a yurt diameter that keeps you under 20m² (typically 5m diameter)
  • Ensure proper setbacks from boundaries (usually 900mm minimum)
  • Avoid permanent foundations to maintain "temporary" classification

This strategy works because exempt development is very low impact development that can be done for certain residential, commercial and industrial properties.

Strategy 2: Frame as "Glamping Tent" Not "Dwelling"

Language matters enormously in council applications. We market our products as 'glamping tents,' but local regulations still apply based on your intended use.

Winning Classifications:

  • Studio or workshop space
  • Glamping accommodation
  • Temporary visitor accommodation
  • Storage or utility building

Avoid words like "dwelling," "residence," or "primary accommodation" which trigger stricter building code requirements.

Strategy 3: Leverage the Temporary Structure Pathway

Position your yurt as easily relocatable, even if you never intend to move it. This classification often bypasses complex approval processes.

Key Requirements:

  • Use raised timber deck foundations (no concrete slabs)
  • Maintain ability to disassemble and relocate
  • Document the temporary nature in applications
  • Avoid permanent utility connections where possible

Strategy 4: Start with Pre-Application Meetings

Any form of structure to be used as a dwelling must have, at minimum, council building and plumbing approval. Avoid surprises by engaging council staff before formal applications.

Meeting Strategy:

  • Present your concept as a low-impact, temporary structure
  • Ask specifically about exempt development pathways
  • Request confirmation of approval requirements in writing
  • Build relationships with planning staff who will assess your application

Strategy 5: Choose Your Zone Wisely

Your property's zoning dramatically affects approval success. Rural and agricultural zones typically offer more flexibility than residential areas.

Zone Advantages:

  • Rural Zones: Generally permit larger exempt structures and alternative uses
  • Tourism Zones: Excellent for glamping and accommodation applications
  • Mixed-Use Zones: Often allow commercial activities like studios or workshops

If your current zone is restrictive, consider properties with more flexible zoning classifications.

Strategy 6: Bundle with Existing Approvals

Link your yurt to existing approved uses on your property to streamline the process.

Bundling Opportunities:

  • Add yurt as ancillary building to existing dwelling
  • Include in farm tourism or agritourism operations
  • Combine with approved business activities
  • Position as accommodation for existing commercial uses

Strategy 7: Emphasise Sustainability and Tourism Benefits

Many councils actively support eco-tourism and sustainable development initiatives. Position your yurt as contributing to these goals.

Environmental Benefits to Highlight:

  • Minimal land disturbance compared to traditional construction
  • Use of sustainable materials and building methods
  • Off-grid capabilities reducing infrastructure demands
  • Support for local eco-tourism economy

Strategy 8: Use Professional Support Strategically

Where Council Approval is required, the Australian Roundhouses™ team will arrange for the preparation of architectural plans and engineer specifications for your submission to Council.

When to Engage Professionals:

  • Complex applications requiring detailed drawings
  • Properties with environmental or heritage overlays
  • Commercial or tourism-related applications
  • Areas where council has previously rejected yurt applications

Strategy 9: Build Community Support

Neighbour objections can derail even compliant applications. Proactive community engagement prevents problems before they start.

Community Engagement Steps:

  • Discuss plans with immediate neighbours early
  • Address potential concerns about noise, privacy, or appearance
  • Consider offering occasional use or other benefits
  • Document neighbour support in writing for your application

Strategy 10: Apply Retrospective Approval Strategy (With Caution)

Some successful yurt owners have installed first and applied for retrospective approval, but this carries significant risks.

Risk Mitigation Approach:

  • Ensure your yurt meets all safety and building standards
  • Maintain good neighbour relations to prevent complaints
  • Have removal plans ready if approval is denied
  • Only consider this in councils known to be flexible with alternative housing

Warning: This strategy can result in costly removal orders and should only be considered after thorough risk assessment.

State-Specific Success Tips

NSW: Focus on complying development pathways and exempt development provisions under the Codes SEPP.

Victoria: Emphasise outbuilding classifications and leverage rural zone flexibility.

Queensland: Some building work may require approval under council planning schemes. Owners are responsible for complying with relevant planning schemes and should check with the local council before starting any work.

Western Australia: Regional councils are often most supportive of alternative housing solutions.

Common Mistakes That Kill Applications

Avoid these approval-killing mistakes:

  • Calling your yurt a "house" or "dwelling" in applications
  • Ignoring setback requirements from boundaries
  • Applying for permanent residential use in restrictive zones
  • Failing to engage with neighbours before lodging applications
  • Underestimating the importance of professional drawings for complex applications

Your Next Steps to Approval Success

  1. Research Your Property: Check zoning, overlays, and council policies specific to your area
  2. Contact Council Early: Schedule pre-application meetings to understand requirements
  3. Choose Your Strategy: Select the most appropriate approach based on your intended use
  4. Prepare Thoroughly: Gather all required documentation and professional support if needed
  5. Engage Your Community: Build neighbour support before submitting applications

Success with yurt approval requires strategy, preparation, and patience. By following these proven approaches and adapting them to your specific circumstances, you'll dramatically improve your chances of approval success. For more information, visit Beyond Yurt.

Disclaimer: This guide provides general strategies only. Always consult with your local council and relevant professionals before proceeding with any yurt project.